Solar panels for commercial property in Wales: an owner and landlord guide
For owners, landlords and asset managers of let commercial buildings in Wales, and for businesses that occupy their own. The short answer: the EPC E letting rule is the same as in England, but planning, business rates, the grid operator and the funding on offer all follow Welsh rules.
Last verified 3 November 2026 against the primary sources listed at the end of this page. General information, not legal, tax or financial advice.
A landlord weighing rooftop solar on a Welsh industrial estate, retail park or office block asks the same questions as one in Bristol or Birmingham: will it protect the EPC, who pays for it, who keeps the saving and what does the lease allow? Those answers do not change at the border. What does change is the paperwork around the array. This guide sets out the Welsh position on each point, so you can read our wider guides on solar panels for commercial property knowing which parts carry across.
MEES in Wales: the same EPC E line as England
The minimum energy efficiency standard for let commercial buildings is a single England and Wales instrument, the Energy Efficiency (Private Rented Property) (England and Wales) Regulations 2015. Since 1 April 2018 it has been unlawful to grant a new lease of a non-domestic building rated below EPC E, and since 1 April 2023 it has been unlawful to go on letting one below E, sitting tenants included (regulation 27). Any higher band you read about for later years is a proposal, not law. Solar is one of the levers that can lift a rating, and our MEES and EPC guide for commercial property covers how that works and what an exemption needs.
Planning: Part 43 permitted development for commercial roofs
Wales has its own permitted-development rules for commercial solar. Rooftop solar on a non-domestic building in Wales falls under Part 43 of Schedule 2 to the General Permitted Development Order 1995 as it applies in Wales, inserted by SI 2012/2318 and amended by SI 2019/330. Class A allows panels on the building where all of these conditions hold:
- they protrude no more than 20cm from a wall or a pitched roof slope, and no more than 1m above the highest part of a flat roof;
- they sit at least 1m in from the external edge of the roof and from any junction between a wall and the roof;
- the building is not within 3km of an aerodrome (added by the 2019 amendment, which also brought in a glint and glare condition);
- the site is not in the curtilage of a listed building and is not a scheduled monument;
- on article 1(5) land, which includes conservation areas, or in a World Heritage Site, the panels are not on a wall or roof slope that fronts a highway.
One point to settle early on a large roof. Part 43 is headed non-domestic microgeneration, and the Energy Act 2004 (section 82) defines microgeneration as plant of up to 50 kilowatts of electrical capacity. Class A's own conditions do not set a size limit, but if your array is well above 50kW, ask the local planning authority to confirm that Class A covers it, ideally through a lawful development certificate, before you commit.
Class B covers a single stand-alone array within the curtilage: no more than 4m high, at least 5m from the boundary, no more than 9 m² of panel and no dimension over 3m. Anything larger on the ground needs planning permission from the local planning authority. For a listed building, Cadw is the national heritage body and listed building consent is a separate question from planning; start that conversation before you specify anything. The general consent and grid process is in our planning and grid guide.
Business rates: the Welsh exception to 2035
Wales has its own rating instrument. SI 2023/1229 excepts from valuation the plant used to generate, store, transform or transmit power from listed renewable sources, photovoltaics among them, from 1 April 2024 until 31 March 2035. Read it as plant on the property: an array on your roof should not lift the rateable value while the exception runs. How a standalone generating site is treated is a different and unsettled question, so take advice if that is your case. On a full repairing and insuring lease the occupier is usually the rates payer, which means the exception mostly protects your tenant's bill, and with it the case you make to them.
Grid: which network your building is on
South Wales is served by National Grid Electricity Distribution, with about 1.2 million customers over 11,800 km² from Pembrokeshire to Monmouth and north to Aberaeron and Rhayader. North Wales is served by SP Energy Networks through SP Manweb, the same licence area as Merseyside, which covers the Wrexham area and the North Wales coast. The exact boundary through mid-Wales is not published in a form we can verify, so check the operator named on your supply before you plan.
The connection rule is the same as the rest of Great Britain. Engineering Recommendation G98 covers inverters up to 16A per phase (about 3.68kW per phase), fitted and then notified. Almost every commercial array is bigger than that, so it needs a G99 application, approved before installation. For the largest estates, the threshold at which a transmission impact assessment is needed in England and Wales rose from 1MW to 5MW in May 2025 (CMP446), where there are no fault-level issues. No operator publishes a standard connection timeline, so we do not quote one.
What a Welsh roof generates
The figures below are modelled long-term averages from the European Commission's PVGIS tool, not a forecast for any one roof. The 10-degree, due-south run stands in for a typical low-pitch commercial roof; east-west layouts and shaded roofs come in lower.
| Location | Optimal tilt (kWh per kWp a year) | 10 degrees, due south (kWh per kWp a year) | Network operator |
|---|---|---|---|
| Cardiff | 1,044 | 946 | National Grid Electricity Distribution |
| Swansea | 1,016 | 921 | National Grid Electricity Distribution |
| Wrexham | 970 | 876 | SP Energy Networks (SP Manweb) |
On those runs, a 250 kWp flat-roof array models at about 236,500 kWh a year in Cardiff, 230,250 kWh in Swansea and 219,000 kWh in Wrexham. The north-to-south gap across Wales is around 7%, small next to the effect of how much of the output the building uses during the day.
Funding in Wales: what is open, what is closed
Set expectations first. For a private owner or landlord of a let commercial building in Wales there is no open grant for rooftop solar today, and the schemes that do exist rarely fit a let building.
- Ynni Cymru 2026/27 is closed. Applications closed at noon on 21 May 2026, and no further round has been announced. It also required low-carbon heat alongside generation, so a solar and battery project on its own was ineligible; SMEs had to find 25% match funding, and solar counted only for the share of payback beyond ten years, capped at 40% of the eligible solar cost.
- Business Wales has no solar grant. Its Future Proofing Fund round has closed, and its support is advice.
- The Welsh Government Energy Service and the Ymestyn grant are for the public sector and community enterprises, not private businesses.
- The Development Bank of Wales Green Business Loan Scheme is live, and it is a loan. It offers discounted fixed interest, upfront capital repayment holidays and a term linked to payback, and it names solar PV among the measures. It is for limited companies, sole traders and partnerships based in Wales that have traded for two years or more with at least one set of filed accounts. The scheme was topped up to £20m with funding available until 2028, and loans run from £1,000 to £1.5m over up to 15 years (Senedd written answer WQ96151). An energy audit grant covers up to 50% of the audit cost, to a maximum of £10,000. Whether a property-investment company letting the building qualifies is for the bank to decide, not for us to assume.
If a grant doesn't fit
Most owners in Wales pay for solar the same way as owners anywhere in Great Britain, and the levers are UK-wide. Owning the array outright brings the capital allowances: solar is special-rate plant, so a business usually takes 100% relief in year one through the £1m Annual Investment Allowance, companies can use the 50% special-rate first-year allowance above that (not on plant bought to lease), and the balance goes to the 6% writing-down pool; full expensing does not cover solar. Spreading the cost through hire purchase or a lease changes who is treated as the owner, which our guide to finance options for commercial solar walks through. A roof lease or third-party PPA removes the capital cost, but the developer then owns the array and claims the allowances. Install VAT on business premises is 20%, normally recoverable if you are VAT-registered, and exported power earns the Smart Export Guarantee, which applies in Wales as across Great Britain for installations up to 5MW. The detail sits in our capital allowances guide for owners, the funding overview and the cost and payback ladder.
Which route fits a let building in Wales
The Welsh rules above change the admin, not the choice of structure. The four routes an owner normally weighs are the same:
- Common-parts supply. The array feeds landlord-paid loads such as lighting, lifts and heating in shared areas, so the saving stays with you and no tenant has to agree to buy power. It suits multi-let offices and estates with a landlord supply. See common-parts solar for landlords.
- Landlord-to-tenant PPA. You own the array and sell the power to the occupier below the grid price, usually wrapped in a green-lease addendum. The lease has to outlast the agreement.
- Roof lease. A developer funds and owns the system and pays you rent. You commit no capital and give up the allowances and most of the generation value.
- Owner-occupier. If you trade from the building, the saving and the allowances are both yours, which is the simplest case.
A worked shape: a landlord with a multi-let trade estate on the National Grid Electricity Distribution network near Cardiff puts 250 kWp on a low-pitch roof. PVGIS models about 236,500 kWh a year. Whether that is worth more on a common-parts supply or sold to an anchor tenant depends on who uses power in daylight hours and on the lease terms, which is the question the split incentive guide answers. You can also run the five questions in the route chooser for let buildings before you talk to anyone.
Tell us about a building in Wales
Where it is, who occupies it and how you expect to fund it. We reply by email.
Wales in numbers
- Renewable generation equalled 55% of Welsh electricity consumption in 2024, against a target of 70% by 2030 and 100% by 2035.
- Just over 1.4 GW of solar PV was installed in Wales by the end of 2024, generating about 1.3 TWh.
- 151 MW of solar was added in 2024 across just under 16,000 projects, and Powys had the most new installations, about 1,478.
- Wales generated 22 TWh of electricity in 2024 against 13 TWh consumed, making it a net exporter.
Source: Welsh Government, Energy Generation and Use in Wales, first combined edition (August 2026).
Sources
Each source was re-read on 3 November 2026. Rules and scheme status change; check the source before you rely on a figure.
- Energy Efficiency (Private Rented Property) (England and Wales) Regulations 2015, regulation 27
- SI 2012/2318 (Wales): Part 43 non-domestic microgeneration permitted development
- SI 2019/330 (Wales): aerodrome exclusion and other Part 43 amendments
- Energy Act 2004, section 82 (definition of microgeneration)
- SI 2023/1229 (Wales): renewable plant excepted from non-domestic rating
- National Grid Electricity Distribution, South Wales long-term development statement
- Ofgem: SP Energy Networks licence area summary
- NESO: transmission impact assessment threshold raised to 5MW in England and Wales
- PVGIS v5.3, Cardiff (Swansea and Wrexham runs use their own coordinates)
- Development Bank of Wales: Green Business Loan Scheme
- Welsh Government: extra £10 million for the Green Business Loan Scheme
- Senedd written question WQ96151 (loan size and term)
- Welsh Government: Ynni Cymru capital grant 2026 to 2027
- Ynni Cymru 2026 to 2027 guidance (PDF)
- Welsh Government Energy Service (public sector and community groups)
- Energy Generation and Use in Wales, first combined edition (August 2026, PDF)
- Ofgem: Smart Export Guarantee
Local notes
For city-level context, see our notes on commercial property solar in Cardiff and on commercial property solar in Swansea.